General Building Requirements for Homes in Apple South, Phase II

 (The following overview is provided to ensure that the basic requirements are met before the complete set of plans are submitted for approval.  Complete conditions and requirement for construction are provided within the covenants.  All plans and materials and contractors will be reviewed and approved by the Architectural Committee before construction begins.)

 GENERAL CONDITIONS:  

q       Living space – 1,700 sq. ft.  …excluding garages, porches, attic space and utility rooms.

q       Garage will be designed not to face the street.  

q       Driveways must be concrete and 12’ in width.  

q       Exteriors preferred shall be brick, stucco or stone (at least 75%).  

q       Roofs will have a minimum 7/12 pitch and covered by architectural shingles.  

q       Windows will be five (5) lite windows minimum, front windows must provide acceptable drapes, curtains or blinds      before the house can be occupied.  

q       Sloping lots must have an approved fill plan.